gates_logo POWERING PROGRESS™

Optimize Beverage Facility Uptime


Convert from Roller Chain to Gates Belts and Save Up to $300,000

  • Up to 55% of labor hours in beverage operations are spent on preventive maintenance
  • Downtime can cost up to $200 per minute
  • Roller chain to synchronous drive conversion can eliminate 3,120 minutes of downtime over two years
  • Gates Poly Chain® GT® Carbon belts last 3x longer than roller chain drives and are virtually maintenance free


See how Gates can increase your operation's uptime.

Small Inefficiencies Add Up to Major Hidden Expenses

Don't let downtime drain your profits.  Outfit equipment with Gates belts and hose to save on maintenance and energy costs, increasing uptime and profits.  From tough Poly Chain® GT® Carbon synchronous belt drive systems and Power Curve® belts, to Food Master® and washdown hoses, Gates top-quality products and unsurpassed support will be your best investment.

Access our "Beverage Facility Bottleneck: Extensive Maintenance" infographic to find out how you can avoid expenses in your facility. Gates synchronous belt drives require no greasy lubrication and are virtually maintenance-free.

"Read our ""Get Flowing at Full Capacity: Optimize Uptime at Your Beverage Facility"" brochure and eliminate downtime within your operation. Gates Poly Chain® GT® Carbon™ belt drives require no lubrication or maintenance, extending performance life. "

Register to Access Your Resource