Data Center Case Study

  • Case Study
  • Industrial, Power Transmission

The belts on 300 V-belt drives used to cool a computer room were failing quickly and had to be changed out four times a year. Learn how the data center benefited from a Gates Poly Chain® GT® Carbon™ belt drive to save an estimated $120k a year.

Download >

share with friends

Sign up for our E-newsletter

Auto – OE
Auto – Aftermarket
Hoses & Hydraulics
Belt Drives

Register to Access Your Resource